Forum Title: 1943/2010
I have been working on this job over the holidays, between the Statutory Days off. Its a repair job, Mastic Asphalt Roofing 1? originally laid to the 10 levels of balconies at the back of the building in 1942/3. My Dads company overlaid with another half inch in the early 1960?s on some levels and on the lower levels they tore off the 1942 material and laid new 1/2?. Its in pretty good nick, just needs a tidy up, fix a few cracks, give it a skim over with the dI'mond grinder and a few coats of paint. One of the tenants gave me a few old pictures from 1943, nothing of the roof, but check this out, how the city has changed first picture is 1943 when the building just opened ( the big white block) taken from the south, the 2nd pic I took last week, from the roof looking back to where the old pic was taken from I'll be here for a couple of months, most of Jan and most of March near the end (the whole building is being painted), with a couple of other jobs squeezed in between in Feb. ?
Category: Roofing Post By: CINDY LAWRENCE (Janesville, WI), 03/19/2018

Helpful Links, Guidance & Tips For Homeowners

requestaquote Get Free Quotes callnow 888-610-8624